AIM Blog

FAA Career Training

AMM Sopwith Camel 7/13/12 Update

Posted by on Jul 13, 2012

Metal fabrication continues as students and faculty work together to complete the Aileron Hinges. The Sopwitch Camel project continues to stay on schedule, as we prepare to begin cabling the spars and brackets of the upper wing.

//// 468 ad