AIM Blog

FAA Career Training

Team Chesapeake Metal Prep to Weld Struts in Place [Photos]

Posted by on Jun 5, 2014

Team Chesapeake Metal Prep to Weld Struts in Place [Photos]

Aviation Institute of Maintenance – Team Chesapeake is moving forward with the upper wing installation. Students, Chaez and Karl are prepping the metal for welding. We should have the cabane struts positioned for a complete weld very soon. Also notice the attachment points that are ready for cable connection. All these parts are made here at the school by students under the supervision of a certified Airframe and Powerplant mechanic. Next we have James Lester doing his magic in welding all the parts together! Please click on the pictures to enlarge and check back soon for the complete installation/welding of the cabane struts.

Team Chesapeake - AIM

Chaez Ryder and Karl Linscott prep for welding

Team Chesapeake - AIM

James Lester doing his magic!

Team Chesapeake - AIM

Lower wing flying brackets

 

Our new segment here shows how we started this project back in 2007.

Many Instructor’s and students  have helped with this aircraft. In the first picture Instructors James Maupin far left and Joe Eggers is far right is showing a student how to bend our first piece of metal for the lower fuselage. Student is holding a temperature gun.

Team Chesapeake - AIM

Instructors James Maupin and Joe Eggers with a student.

Team Chesapeake - AIM

Flash Back 2007

//// 468 ad