AIM Blog

FAA Career Training

Work on the Upper Wings is Underway

Posted by on Aug 13, 2012

Robert Leming and Chris Baier are checking the front spar for the proper angle. Both front and rear spars are done ready to start assembly of upper wing

Work on the wings moves ahead

Posted by on Aug 7, 2012

Here Dan Nibbe is installing the plywood reinforcements for the cable brackets for the inside of the wing

 

More visual progress

Posted by on Jul 23, 2012

Sometimes you just have to put the parts in place to see how far you have come.

Checking the Wings for Fit

Posted by on Jul 16, 2012

Here we are checking to see how things will fit and also to give the students and faculty visual progress

The lower wings are almost ready for fabric

Posted by on Jul 10, 2012

The Nieuport takes another step closer to completion as the students get ready to install the fabric covering on the lower wings.

Matt Wright, Dan Nibbe and Sherri-Sharpe Folsom are preparing the lower wing for covering